Delivering high-quality fabrication, offshore construction and infrastructure projects with proven expertise.
Ongoing
Pre fab, Fabrication, assembly of Topside Deck Platforms (SD-1A & CA-6A) (1318 MT)
Ongoing
Fabrication of Piles for C37-1,NMT-A,SB15-A, D33-A(5500 MT)
Completed
Fabrication of Conductor Protectors D Frames With Clamps, Access Platform, Conductor Pipe (785 MT)
Completed
Pre fab, Fabrication, assembly of Jacket, Deck,Piles & Conductors (2150 MT) Piping Fabrication erection hydrotesting Final Testing Load out and...
Completed
Fabrication of Riser Clamps (70 MT)
Completed
Hiring of Painting Services at PTYS Nhava for 02 years Duration
Completed
Fabrication of Conductor Protectors D Frames With Clamps, Access Platform, Conductor Pipe (1100 MT)
Completed
Fabrication of Riser Protectors (05 nos), Boat Landing cum Barge Bumper (06 nos) Boat Landing Cum Riser Protector (02 nos)...
Completed
Fabrication-assembly & Erection of Hull sections/Units/Blocks.(1135 MT)
Completed
Fabrication of J Tube,Riser Clamps, Cages for PRP 6 project 246.11 MT (28 platform.)
Completed
Fabrication of Riser Protectors (11nos ), Boat Landing (01 nos) for PRP 5 project (920 MT)
Completed
Pre fab, Fabrication, assembly of CPP-LQUP Bridge 06 Chord with 91.5 mtr length (720 MT)
Completed
Pre fab, Fabrication, assembly of Tripod Jacket (2400 MT) & fabrication of Piles.for KG-DWN 98/2 project
Completed
Hiring of Painting Services at PTYS Nhava for 02 years Duration
Completed
Fabrication of Hull Units of P 17 A Ships at Mazgon Dock ,Nhava Yard (355 MT)
Completed
Civil Work for Inauguration of NHAVA Yard,MDL
Completed
Civil & structural work at ONGC Uran site
Completed
Fabrication of Installation Aid for Fifth Oil berth project at Jawahar Dweep
Completed
Fabrication of J Tube,Riser Clamps, Cages for PRP 5 project+230 MT (28 platform.)
Completed
Fabrication of Piping & Structure for Life Extension of well Platform Project
Completed
Replacement of 500 MTR Section of 24” Crude oil Pipeline (Integrated Civil & Mechanical Scope)
Completed
Fabrication of Riser Protector, Boat landing, T-Protector/Cages,for B127 Cluster Pipeline RTR Project (+525.88 MT)
Completed
Fabrication of Deck extension at ROHINI Yard related to DDP & PRP4 (100.85 MT)
Completed
Fabrication of SSIV Spool & Laterals and Valves Installation at Retibandar jetty. (Pipeline)
Completed
Fabrication of Chaser Pile, Cage Modification, Loading & Sea Fastening of subsea Heavy Structures for B127 Cluster Pipeline RTR Project
Completed
Fabrication of SSIV Skid, Lateral Cage.
Completed
Onshore Fabrication of CRA Clad line of PRP 4 & C 26 Project.
Completed
Fabrication of Riser Protectors (02 Nos) Riser Protector with Boat Landing (01 Nos) And PLEM (01 Nos). +500 MT
Completed
Fabrication of Protection Cage for SSIV (01Nos),Cage for Future Lateral (02 Nos),Protection Cage for Piggable Way (02 Nos) and for...
Completed
Fabrication of Riser Protector (03 Nos) & MOPU Deck Extension(01Nos).+250MT
Completed
C-26 Cluster pipeline Project Fabrication of Riser Protector (03 Nos)
Completed
Fabrication of Piping & Structure for Life Extension of well Platform Project
Completed
Fabrication & Welding of Piping Works, scope matrix &boq for Fire Water Network Project at Uran ONGC
Completed
Sandblasting & Painting of Structural Work for Fire Water Network Project
Completed
Fabrication of Riser protector HY & HZ Platform
Completed
fabrication, Installation, Hydrotest, Pre- commissioning & Commissioning at Offshore.