Projects

OUR PROJECTS

Engineering Excellence Across Industries

Delivering high-quality fabrication, offshore construction and infrastructure projects with proven expertise.

DSF-II project Ongoing

DSF-II project

Owner ONGC
Client Carlton-MDL
Location
Year 2025-2026

Pre fab, Fabrication, assembly of Topside Deck Platforms (SD-1A & CA-6A) (1318 MT)

DSF-II project Ongoing

DSF-II project

Owner ONGC
Client CSBD-MDL
Location
Year 2025-2026

Fabrication of Piles for C37-1,NMT-A,SB15-A, D33-A(5500 MT)

Clamp On Group C Project Completed

Clamp On Group C Project

Owner ONGC
Client Supreme offshore Constructions & Technical Services Ltd.
Location
Year 2026

Fabrication of Conductor Protectors D Frames With Clamps, Access Platform, Conductor Pipe (785 MT)

BDAWP project Completed

BDAWP project

Owner Sun Petrochemicals Private Limited (Sunpetro)
Client Chowgule SBD Private Limited
Location CSBD Manglore yard
Year 2024-25

Pre fab, Fabrication, assembly of Jacket, Deck,Piles & Conductors (2150 MT) Piping Fabrication erection hydrotesting Final Testing Load out and...

PRP-8 (Group B) Project Completed

PRP-8 (Group B) Project

Owner ONGC
Client L&T Energy Hydrocarbon
Location Hiral workshop-A-79 Retibandar yard CBD Belapur
Year 2025

Fabrication of Riser Clamps (70 MT)

Hiring of Painting Services Completed

Hiring of Painting Services

Owner ONGC
Client ONGC
Location PTYS NHAVA Supply Base
Year 2024-2026

Hiring of Painting Services at PTYS Nhava for 02 years Duration

Clamp On Group A&B Project Completed

Clamp On Group A&B Project

Owner ONGC
Client AJRES-Das Offshore Ltd
Location Retibandar yard CBD Belapur
Year 2024

Fabrication of Conductor Protectors D Frames With Clamps, Access Platform, Conductor Pipe (1100 MT)

BBBLRP-IV project Completed

BBBLRP-IV project

Owner ONGC
Client CARLTON-ONGC
Location Retibandar yard CBD Belapur
Year 2023-2024

Fabrication of Riser Protectors (05 nos), Boat Landing cum Barge Bumper (06 nos) Boat Landing Cum Riser Protector (02 nos)...

Fabrication-Assembly & Erection of Hull Units Completed

Fabrication-Assembly & Erection of Hull Units

Owner GOA SHIPYARD LIMITED
Client GOA SHIPYARD LIMITED
Location GOA SHIPYARD LIMITED VASCO
Year 2021-2022

Fabrication-assembly & Erection of Hull sections/Units/Blocks.(1135 MT)

PRP 6 Project Completed

PRP 6 Project

Owner ONGC
Client Supreme offshore Constructions & Technical Services Ltd.
Location Pawane Workshop
Year 2019-2020

Fabrication of J Tube,Riser Clamps, Cages for PRP 6 project 246.11 MT (28 platform.)

PRP-V project Completed

PRP-V project

Owner ONGC
Client CCPL Lavgan Yard/SAPURA
Location CCPL Lavgan Yard/SAPURA
Year 2019-20

Fabrication of Riser Protectors (11nos ), Boat Landing (01 nos) for PRP 5 project (920 MT)

KG-DWN 98/2 project Completed

KG-DWN 98/2 project

Owner ONGC
Client DAS OFFSHORE LTD /AFCONS
Location Das Rohini Yard
Year 2019-20

Pre fab, Fabrication, assembly of CPP-LQUP Bridge 06 Chord with 91.5 mtr length (720 MT)

KG-DWN 98/2 project Completed

KG-DWN 98/2 project

Owner ONGC
Client DAS OFFSHORE LTD /AFCONS
Location Das Rohini Yard
Year 2019-20

Pre fab, Fabrication, assembly of Tripod Jacket (2400 MT) & fabrication of Piles.for KG-DWN 98/2 project

Hiring of Painting Services Completed

Hiring of Painting Services

Owner ONGC
Client ONGC
Location PTYS NHAVA Supply Base
Year 2020

Hiring of Painting Services at PTYS Nhava for 02 years Duration

Fabrication of Hull Units Completed

Fabrication of Hull Units

Owner Mazgon Dock Shipbuilders limited
Client Mazgon Dock Shipbuilders limited
Location MDL NHAVA YARD
Year 2017-2018

Fabrication of Hull Units of P 17 A Ships at Mazgon Dock ,Nhava Yard (355 MT)

Civil Work for Inauguration Completed

Civil Work for Inauguration

Owner Mazgon Dock Shipbuilders limited
Client Mazgon Dock Shipbuilders limited
Location MDL NHAVA YARD
Year 2019

Civil Work for Inauguration of NHAVA Yard,MDL

Civil & structural work at ONGC Uran site Completed

Civil & structural work at ONGC Uran site

Owner ONGC
Client G.R.Engineering Pvt.Ltd.
Location ONGC URAN SITE
Year 2018-2019

Civil & structural work at ONGC Uran site

Fabrication of Installation Aid for Fifth Oil berth project Completed

Fabrication of Installation Aid for Fifth Oil berth project

Owner ONGC
Client Sapura Engineering & Construction (India) pvt.ltd.
Location Retibandar Waterfront yard
Year 2019

Fabrication of Installation Aid for Fifth Oil berth project at Jawahar Dweep

PRP 5 project Completed

PRP 5 project

Owner ONGC
Client OHCS/SAPURA
Location Retibandar Waterfront yard & Pawane Workshop
Year 2018-2019

Fabrication of J Tube,Riser Clamps, Cages for PRP 5 project+230 MT (28 platform.)

LEWPP Completed

LEWPP

Owner ONGC
Client PCTS/AFCONS
Location Pawane Workshop
Year 2018-2019

Fabrication of Piping & Structure for Life Extension of well Platform Project

Replacement of 500 MTR Section of 24” Crude oil Pipeline Completed

Replacement of 500 MTR Section of 24” Crude oil Pipeline

Owner ONGC
Client DAS OFFSHORE LTD
Location Trombay Terminal, ONGC
Year 2017-2018

Replacement of 500 MTR Section of 24” Crude oil Pipeline (Integrated Civil & Mechanical Scope)

B127 Cluster Pipeline RTR Project Completed

B127 Cluster Pipeline RTR Project

Owner ONGC
Client OHCS/SAPURA
Location Retibandar Waterfront yard
Year 2017-2018

Fabrication of Riser Protector, Boat landing, T-Protector/Cages,for B127 Cluster Pipeline RTR Project (+525.88 MT)

DDP & PRP-4 project Completed

DDP & PRP-4 project

Owner ONGC
Client DAS OFFSHORE LTD
Location Das Rohini Yard
Year 2018-19

Fabrication of Deck extension at ROHINI Yard related to DDP & PRP4 (100.85 MT)

DDP & PRP-4 project Completed

DDP & PRP-4 project

Owner ONGC
Client Kreuz Subsea Pte Ltd
Location Retibandar Waterfront yard
Year 2018

Fabrication of SSIV Spool & Laterals and Valves Installation at Retibandar jetty. (Pipeline)

 B127 Cluster Pipeline RTR Project Completed

B127 Cluster Pipeline RTR Project

Owner ONGC
Client Sapura Offshore Sdn.Bhd.
Location Retibandar Waterfront yard
Year 2017-18

Fabrication of Chaser Pile, Cage Modification, Loading & Sea Fastening of subsea Heavy Structures for B127 Cluster Pipeline RTR Project

DDP & PRP-4 project Completed

DDP & PRP-4 project

Owner ONGC
Client DAS OFFSHORE LTD
Location Retibandar Waterfront yard
Year 2016-17

Fabrication of SSIV Skid, Lateral Cage.

PRP 4 & C 26 Project. Completed

PRP 4 & C 26 Project.

Owner ONGC
Client SWIBER Offshore Construction Pte Ltd
Location Retibandar Waterfront yard
Year 2016

Onshore Fabrication of CRA Clad line of PRP 4 & C 26 Project.

MHNRD Phase III Pipeline Project Completed

MHNRD Phase III Pipeline Project

Owner ONGC
Client Supreme offshore Constructions & Technical Services Ltd.
Location Retibandar Waterfront yard
Year 2016

Fabrication of Riser Protectors (02 Nos) Riser Protector with Boat Landing (01 Nos) And PLEM (01 Nos). +500 MT

MHNRD Phase III Pipeline Project Completed

MHNRD Phase III Pipeline Project

Owner ONGC
Client Supreme offshore Constructions & Technical Services Ltd.
Location Retibandar Waterfront yard
Year 2016

Fabrication of Protection Cage for SSIV (01Nos),Cage for Future Lateral (02 Nos),Protection Cage for Piggable Way (02 Nos) and for...

C-26 project Completed

C-26 project

Owner ONGC
Client DAS OFFSHORE LTD
Location Retibandar Waterfront yard
Year 2016

Fabrication of Riser Protector (03 Nos) & MOPU Deck Extension(01Nos).+250MT

C-26 project Completed

C-26 project

Owner ONGC
Client DAS OFFSHORE LTD
Location Retibandar Waterfront yard
Year 2016

C-26 Cluster pipeline Project Fabrication of Riser Protector (03 Nos)

GSPC Project Completed

GSPC Project

Owner ONGC
Client PCTS/L&T
Location L&T Hazira Yard
Year 2012

Fabrication of Piping & Structure for Life Extension of well Platform Project

Fire Water Network Project Completed

Fire Water Network Project

Owner ONGC
Client Tata Projects Ltd.
Location URAN ONGC PLANT
Year 2012-2014

Fabrication & Welding of Piping Works, scope matrix &boq for Fire Water Network Project at Uran ONGC

Fire Water Network Project Completed

Fire Water Network Project

Owner ONGC
Client Tata Projects Ltd.
Location URAN ONGC PLANT
Year 2012-2014

Sandblasting & Painting of Structural Work for Fire Water Network Project

Heera Redevelopment Phase-III Project Completed

Heera Redevelopment Phase-III Project

Owner ONGC
Client DAS OFFSHORE LTD
Location Retibandar Waterfront yard
Year 2015

Fabrication of Riser protector HY & HZ Platform

BPA-BPB Revamp Project    Completed

BPA-BPB Revamp Project

Owner ONGC
Client Mathew Associates Hook up & Weld services.
Location Mumbai High
Year 2015

fabrication, Installation, Hydrotest, Pre- commissioning & Commissioning at Offshore.